Rapid Fire Zone™

Offers an expanded nailing zone for precision and ease during installation, ensuring each shingle is securely attached and properly aligned.

Reinforced Nailing Line

Features a 2-inch poly strip that reinforces the nailing zone, enhancing the overall durability and wind resistance of the shingles.

Enhanced Sealant

The shingles include a polymer-modified sealant that provides superior adhesion, ensuring reliable performance even in cooler weather conditions.

Technical Specs

Material: Fiberglass/Asphalt Construction.

Rapid Fire Zone™: Expanded 1-1/2″ nailing zone for precise installation.

Reinforced Nailing Line: 2" poly strip reinforcing the nailing zone for enhanced durability.

Sealant: Enhanced, polymer-modified shingle sealant for superior adhesion.

Warranty: Limited Lifetime warranty, with a 10-year Full Start™ non-prorated period.

Algae Protection: 10-year Algae Cleaning Limited Warranty.

Color Options: Available in 22 colors.

Wind Warranty: 15-year limited warranty for winds up to 160 mph with specific installation instructions.

Shingle Size: 13-1/4" × 39-3/8".

Exposure: 5 5/8".

Pieces/Square: Approx. 64.

Bundles/Square: Approx. 3.

Install Package

Tear Off Existing Roofing System

Removal of the existing roofing down to the sheathing, ensuring a clean base for the new installation.

Install Underlayment

Application of full peel and stick underlayment for enhanced protection against Florida's weather conditions.

Replace Lead Stacks

Upgrading lead stacks to ensure proper ventilation and sealing

Replace All Vents

Installation of new vents for adequate roof and attic ventilation.

Replace All Flashing

Updating flashing around roof features like chimneys, valleys, and edges for waterproofing.

Starter Strip Installation

Laying down a starter strip to provide the first line of defense against wind uplift at the eaves.

Install New Drip Edge

Fitting new drip edges to direct water away from the fascia and protect the roof's edge from water infiltration.

Install Hip and Ridge Vent

Setting up a hip and ridge vent system, which is crucial for maintaining proper attic ventilation.

Install New Shingles

Application of new Tamko Titan XT shingles.

Waste Management

Provision of a dumpster for debris and a thorough cleanup post-installation to leave the property tidy.

Install Process

Shingle installs are typically completed within 1-3 business days. The timeline and schedule is weather dependent and inspections can vary from county to county.

Deliver Materials

The materials will be delivered in the driveway a couple days prior to the scheduled install date. A Kris Konstruction rep will stop by prior to the install to completed an Materials check to verify that the correct and completed order has been delivered.

Phase 1: Tear-off Existing Roof

Removal of existing roof is disposed into the dumpster and hauled away. The entire perimeter of the house will be cleaned up. We use magnetic rakes to pickup any loose nails in the yard and garden.

Dry-in Inspection

Depending on the county, the roof dry-in inspection may be completed within the same day as the tear off via virtual inspection. If an in-person inspection is required, typically the dry-in inspection is completed the following day.

Phase 2: Install

Once the dry-in inspection is passed, we begin installing the new shingles and complete the roof install. Upon completion, another round of clean up will be done.

Final Inspection

Depending on the county schedule, the final inspection is scheduled for as soon as possible after we completed the roof install.

Lifetime Labor Warranty

All of our work is covered by a Lifetime Warranty covering both labor and materials.

Get a Roof Estimate

Step 1/4

Let's start with locating the property

Let us know which property you are requesting an estimate for.

Build your proposal

Let us know which roof estimates you are looking for as well as additional details about the project.

Finally, confirm your contact information

After you submit your request for a roof estimate, a Kris Konstruction rep will reach out to you to confirm we received your request and will guide you on next steps.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.